Advanced High-Efficiency Air Cooling System for EPS Molding

Customization: Available
After-sales Service: 2 Years
Warranty: 2 Years

Product Description

🔹 Basic Information
Model NO.
GX-180
Product Type
HDF Production Line
Automatic Grade
Automatic
Power Source
Electric
Certification
CE, ISO
System
Auto Air Cooling EPS Block Machine
Material
Steel Structure
Power (Kw)
9.5kw
HS Code
84778000
Capacity
50 Sets Per Month
EPS Molding Air Cooling System
⭐ Key Product Features
1) Multi-Functional Equipped with Synchronous transmission with wide adjusting range for machine multipurpose application.
2) Best Quality Welded by high quality profile steel with age heating treatment to ensure high strength without deformation.
3) Easy Operation Adopted PLC Controller and Touch Screen to realize automatic circulation of all molding processes.
4) Long-time Used Special aluminum alloy in machine cavity provides high thermal conductivity and long lifetime.
5) Advanced Technology Using overseas advanced through-heat molding technique and variable pressure blower.
6) Excellent Performance Strong penetrating power leads to good bonding effect and low moisture content in EPS blocks.
📊 Product Parameters
Item Unit PSB-A600 PSB-A800
Net Internal Size of Mouldmm6120x1240x6308160x1250x630
Adjustable Size of Mouldmm6120x980x6308160x980x630
Volume of Mould Chamber3.77-4.785.0-6.37
Product DensityKg/m³4.5-304.5-30
Production EfficiencyPiece/h6-106-10
Steam PressureMpa0.6-0.80.6-0.8
Total PowerKw20.520.5
Power SupplyV380V or 220V alternative
🛠️ Installation & Production
Installation Guide
Production Process
Quality Control
Professional manufacturer of exterior wall insulation equipment and composite panel equipment. The production lines for rock wool, polyurethane, and EPS phenolic foam have reached international advanced levels and passed ISO 9001 quality management system certification.
📦 Packaging & Shipping
Packaging Detail
Shipping Load
❓ Frequently Asked Questions
Do you accept on-site inspections for the machinery?
Yes, before shipment, every piece of equipment is trail-tested in our factory. We invite all clients to perform on-site inspections during this testing phase.
What are your standard payment terms?
We accept T/T, L/C, Western Union, and Cash.
What is the typical delivery time?
If products are in stock, delivery is within 5-10 days. For custom production, the lead time is typically 1-3 months depending on order quantity.
Do you provide OEM/ODM services?
Yes, we provide custom-made services to meet the different technical needs and budgets of our global clients.
How is the equipment installed after purchase?
We provide professional installation videos and a comprehensive manual to illustrate the process.
What kind of guarantee do you offer?
We guarantee our products for one year and provide ongoing after-sales service and technical support.

Related Products